OBJECTIVES DOE-HDBK-1017/2-93 Brittle FractureENABLING OBJECTIVES (Cont.)1.10LIST the normal actions taken, in sequence, if the minimum pressurization-temperaturecurve is exceeded during critical operations.1.11STATE the precaution for hydrostatic testing.1.12IDENTIFY the basis used for determining heatup and cooldown rate limits.1.13IDENTIFY the three components that will set limits on the heatup and cooldown rates.1.14STATE the action typically taken upon discovering the heatup or cooldown rate has beenexceeded.1.15STATE the reason for using soak times.1.16STATE when soak times become very significant.MS-04 Page vi Rev. 0
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business